From project requirements to ready-to-connect module.
We reduce on-site complexity by moving boiler room construction, assembly and preparation into a controlled off-site workflow.
Project requirements
Heating power, fuel type, site access, available space and operating requirements are reviewed.
Module configuration
The module format, storage volume, boiler technology, service access and construction type are selected.
Engineering and documentation
Technical layout and project-specific documentation are prepared for review and coordination.
Off-site assembly
Boiler equipment, hydraulic connections, ventilation, storage and automation are assembled before delivery.
Factory testing
Installed components and technical connections are checked before dispatch.
Delivery and connection
The completed module is delivered to site and prepared for connection to the building heating system.
Commissioning support
Support is provided for start-up, documentation handover and project completion.